Lift motor room
A lift (or elevator) is a form of vertical transportation between building floors, levels or decks, commonly found in multi-storey buildings.
A lift motor room (sometimes referred to as an elevator machine room), is a room that houses the machinery and electrical controls that operate a lift.
A lift motor room will typically contain:
- Electrical disconnects.
- Machine (geared, gearless or drum type).
- Machine brake.
- Drive motor.
- Encoder.
- Motor generator set.
- Selector.
- Counterweight governor.
- Rope gripper.
- Light fixtures and light control switch.
- Fire alarm devices.
- Hoist beam.
- HVAC equipment.
- Deflector sheaves.
Typically, the entrance to a lift motor room is located in a public corridor, but the room should be fully enclosed or otherwise secured against non-authorised access.
A lift motor room should be well-ventilated and provided with a controlled environment to prevent damage to the equipment. A lifting beam on the ceiling and a floor hatch should be included so that heavy machinery and parts can be winched in and out of the room.
For traction lifts, the room is usually located above the hoistway of the lift that is served by the equipment. This is often on a rooftop of a building or two storeys above the highest storey that the lift serves.
The room can also be found on the ground floor or in the basement if overhead space is unavailable. In this case, the lift cable is a complete chain with an unpowered sheave at the top of the shaft and a powered sheave at the bottom. It may also be on the ground floor or in the basement in the case of hydraulic lifts.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.